Solar array survey

Client Sunline EnergyLocation Wilson County, NCYear 2026
Solar array survey
Summary

A 200-megawatt utility-scale solar field, flown end-to-end for asset documentation and a defect-tracking baseline.

Solar array survey — gallery 1
Solar array survey — gallery 2
Brief

Sunline needed a single, clean ortho of every panel block on the site — geo-tagged, high-resolution, suitable for handing to any third-party inspector going forward.

Approach

RTK-anchored grid flight across two consecutive days. Same altitude, same overlap, same time-of-day window for consistent shadow conditions.

Outcome

Single seamless orthomosaic at 1.2cm/pixel ground resolution. The first inspection cycle ran on top of it within a week of delivery.

Solar array survey — gallery 3
Delivered

What landed in the inbox.

  • Orthomosaic GeoTIFF (1.2cm/px)
  • Defect-spot grid layout (CSV + KML)
  • RGB + thermal capture per block
  • Hand-off in Sunline's inspector format