Solar array survey
Client Sunline EnergyLocation Wilson County, NCYear 2026
Summary
A 200-megawatt utility-scale solar field, flown end-to-end for asset documentation and a defect-tracking baseline.

Brief
Sunline needed a single, clean ortho of every panel block on the site — geo-tagged, high-resolution, suitable for handing to any third-party inspector going forward.
Approach
RTK-anchored grid flight across two consecutive days. Same altitude, same overlap, same time-of-day window for consistent shadow conditions.
Outcome
Single seamless orthomosaic at 1.2cm/pixel ground resolution. The first inspection cycle ran on top of it within a week of delivery.
Delivered
What landed in the inbox.
- Orthomosaic GeoTIFF (1.2cm/px)
- Defect-spot grid layout (CSV + KML)
- RGB + thermal capture per block
- Hand-off in Sunline's inspector format